Irvine seeks grants to coordinate traffic signals and design road widening
News Briefing
AI SummaryKey Point
Irvine is seeking transportation grants to coordinate 28 traffic signals across Irvine and Newport Beach and design a separate widening of Campus Drive, according to Voice of OC. The proposals aim to ease congestion but do not establish how much travel times would improve.
What Happened
The proposals would draw on Measure M2, a voter-approved transportation sales tax measure, alongside local matching funds. Irvine's staff report puts the competitive funding available to Orange County cities for intersection improvements and signal coordination at about $45 million, according to Voice of OC.
Irvine is seeking transportation grants to coordinate 28 traffic signals across Irvine and Newport Beach and design a separate widening of Campus Drive, according to Voice of OC. The proposals aim to ease congestion but do not establish how much travel times would improve.
The proposals would draw on Measure M2, a voter-approved transportation sales tax measure, alongside local matching funds. Irvine's staff report puts the competitive funding available to Orange County cities for intersection improvements and signal coordination at about $45 million, according to Voice of OC.
The Campus Avenue/Irvine Avenue Project would link signals along a corridor running between Turtle Rock Drive and 17th Street. It includes 14 intersections in each city, Voice of OC reported.
Newport Beach plans to replace or upgrade signal controllers, communications equipment, backup batteries and closed-circuit television cameras. According to the city's staff report cited by Voice of OC, the synchronization project has an estimated total cost of $2.4 million. The separately reported city funding figures do not clearly reconcile with that total.
The Campus Drive proposal would fund design work for an expansion between Carlson Avenue and University Drive from two lanes to four. Plans call for a sidewalk on the north side and replacement of Class 2 bike lanes with Class 4 bikeways.
Design work is estimated to cost $800,000, with a proposed $600,000 grant and about $200,000 from Irvine, representing a 25% local match. Those figures cover design, not construction, according to Voice of OC.
The funding applications seek support from the Orange County Transportation Authority. Voters approved Measure M2 in 2006, according to the authority's website cited by Voice of OC. Irvine's staff report says the city has received about $44 million in Measure M2 funding since 2011.
Other Orange County cities are pursuing similar efforts: Laguna Beach officials aim to coordinate 40 lights with Dana Point along Pacific Coast Highway, while Anaheim, Brea, Fullerton and Orange approved plans earlier in the summer covering 58 intersections. Voice of OC did not specify application deadlines or completion dates for the Irvine proposals.
This article was written by OC LifeHub staff with AI assistance, based on reporting by Voice of OC, and fact-checked against the source.
Article Facts
Voice of OC
voiceofoc
Local
Nov 17, 2026
3 days ago
Neutral
Open the original article for full context
Go to Voice of OC to read the complete story, quotes, and full reporting context.





